2" 90 nahtloser Ellbogen Edelstahls 304 Grad-Ellbogen LR BW sch40s

Other Videos
June 26, 2023
Category Connection: Edelstahl-tee
Qualitäts-Edelstahl-Ellbogen von China.
https://www.buttweldingfitting.com/china-2_90_deg_elbow_lr_bw_sch40s_stainless_steel_304_seamless_elbow-38084969.html
TOBO-STAHLKONZERN-CHINA-Qualitätshersteller von China.
Wir können liefern:
Kolben-Schweißungs-Installationen: https://www.buttweldingfitting.com/supplier-butt_weld_fittings-87591.html
Edelstahl-Ellbogen: https://www.buttweldingfitting.com/supplier-stainless_steel_elbow-87592.html
Edelstahl-T-Stück: https://www.buttweldingfitting.com/supplier-stainless_steel_tee-87593.html
Willkommen, zum unserer offiziellen Website zu besichtigen: http://www.buttweldingfitting.com
Brief: Discover the high-quality Pipe Fittings Stainless Steel Tee 304 316 SCH10, perfect for water supply, fire drainage, and more. Made from seamless tees DN40, this forged fitting ensures durability and reliability in high-pressure applications.
Related Product Features:
  • Made from high-quality stainless steel 304/316 for superior durability.
  • Designed for high-pressure applications with SCH10 rating.
  • Seamless construction ensures leak-proof performance.
  • Available in equal shape with round head design.
  • Suitable for water supply, fire drainage, and other industrial uses.
  • Features male/female connection for versatile installation.
  • Branded as HAGA, ensuring trusted quality and performance.
  • Supplied in cartons on pallets for secure delivery.
Fragen und Antworten:
  • What materials are used in the Pipe Fittings Stainless Steel Tee?
    The tee is made from high-quality stainless steel 304 or 316, ensuring durability and resistance to corrosion.
  • What applications is this stainless steel tee suitable for?
    This tee is ideal for water supply, fire drainage, and other high-pressure industrial applications.
  • What is the lead time for ordering these fittings?
    For orders up to 1000 pieces, the lead time is 20 days. For larger quantities, the lead time can be negotiated.